Waterfronts
The following representative projects were done either while
Brad Johnson was principal of
Johnson, Sustronk, Weinstein + Associaties Limited, or after 1984,
as principal of
Brad Johnson + Associates Limited.
Humber
Bay Park
  
Project
Description: Master plan and design for a waterfront park, built
on a totally man-made island.
Client: Metropolitan Toronto and Region Conservation Authority
and Metro Toronto Parks
Role:
Principal Designer
Songhees
Lands
Project
Description: Master plan and design of the watefront lands for
a major redevelopment project which incorporated hotels, marinas,
parks and civic spaces.
Role: British Columbia Ministry of Lands and Housing and Lombard
North Group
Sarnia
Waterfront- Civic Showplace Phase 1
Project
Description: Develoment of public waterfront facilities
Client: City of Sarnia
Role: Principal Designer in collaboration with NAK Design
Group and Ron Baird, sculptor.

Toronto Waterfront
Etobicoke Sector
Project
Description: Master plan

Lakeview
Park

Project
Description: Master plan for Lakeview Park, Oshawa
Client: City of Oshawa Parks Department
Role: Principal Designer

Project
Index | Biography
| Home |
Brad
Johnson + Associates Limited, P.O. Box 35 Station A, Port Hope,
Ontario L1A 3V9 Tel: 905.797.2725
email: wildapple@earthlink.net
|